Excerpt: A time study shows how work happens during an observation. Cycle timers and response data can help you see what happens afterward, set realistic targets, and give employees useful feedback.
Time studies are a familiar tool in Lean manufacturing. By observing an operation, timing its steps, and talking with the people doing the work, you can find unnecessary movement, uneven work, and delays. But a study covers only the time someone is watching. What happens across the next hundred or thousand production cycles?
That’s where continuous measurement can help. Shop Floor IQ records production cycle times, counts, and requests for assistance as work happens. A Lean team can use that information to identify patterns, check whether an improvement lasts, and give employees timely feedback against a target.
What can a traditional time study tell you?
A person observing the station can see things a timer cannot: a tool that’s hard to reach, an awkward work sequence, a quality check that interrupts flow, or an operator waiting for materials. Those observations, and the employee’s explanation of what is happening, are the starting point for improving the process.
The challenge is that the conditions observed on Tuesday morning may not reflect every shift, product, or interruption. An occasional wait for inspection might never occur during the study. A process that looks consistent over 20 cycles may vary considerably over a longer run.
What changes when you measure every cycle?
Imagine an assembly station with an average cycle time of 12 minutes. If you only look at the average, you cannot tell whether most cycles take about 12 minutes or whether some take nine and others take 18. Recording cycle times over time gives the team a way to examine that variation and look for its causes.
he same applies when an employee calls for help. Shop Floor IQ can record the request and its response, making it easier to see whether waiting for parts, inspection, or a supervisor is a recurring source of delay. That is a process question worth investigating with the people at the station.
Compare similar work when reviewing the data. Product mix, changeovers, staffing, planned stops, and rework can all affect cycle time. An unusually long cycle is a reason to ask what happened, not a conclusion about someone’s performance.
Did the improvement stick?
Suppose the team observes that employees regularly walk across the station for a tool. It changes the layout and finds that a repeatable cycle can be completed in about 10 minutes rather than 12. A follow-up time study can confirm the new method. Continued cycle measurements can then show whether the gain persists during ordinary production and across shifts.
This is where a time study becomes part of an ongoing improvement cycle:
- Observe the work and establish a baseline.
- Improve the process with the people doing it.
- Provide a safe working environment. Injuries mean lost productivity. Check for the following on your shop floor:Confirm that the change supports safety and quality.
- Set a realistic target for the improved process.
- Give employees feedback during the cycle.
- Keep measuring and adjust when conditions change.
The 12-to-10-minute example is illustrative. The right target for any station depends on the actual work, the production requirements, and what the team learns on the floor.
Use the target to guide the work
After a team establishes a practical target, a production timer can show employees how the current cycle compares with it. When the station is falling behind, that feedback can prompt an early request for assistance. It can also help a supervisor see where the process needs support.
A target is most useful when employees have a say in how it is set and a clear way to raise problems. If the station routinely misses it, look for the cause: unavailable materials, equipment trouble, uneven work content, or a target that needs revision. The goal is to improve the process and provide useful feedback, rather than treat each slow cycle as an individual failure.
Start with one station
Choose a repeatable operation, define when its cycle begins and ends, and collect a baseline. Observe the work alongside the data. Make one improvement, check its effect on quality and safety, then establish a target and review the results over time. A small pilot makes it easier to learn what is useful before expanding to other stations.
A time study gives you a close look at the work. Continuous measurement helps you see what happens next. Together, they can turn an occasional study into a practical loop of observation, improvement, feedback, and learning.
Want to see how production timers and calls for assistance could work in your facility? Contact Shop Floor IQ for a demo.
